SAP Activate Project Manager Sample Questions:
QUESTIONS
01. You want to record defects in inspection lot processing. In the Implementation Guide (IMG), which elements can you combine in a defect report type?
Please choose the correct answer.
a) Confirmation Profile, Catalog Profile, Notification Type
b) Confirmation Profile, Defect Class, Origin of the Catalog Profile
c) Confirmation Profile, Catalog Profile, Defect Type, Work Center
d) Confirmation Profile, Catalog Profile, Origin of the Catalog Profile
02. When you activate QM in the material master in Procurement, to which organizational level does the function apply?
Please choose the correct answer.
a) Controlling area
b) Client
c) Plant
d) Company code
03. During quality inspection archiving, in which sequence must the system process the data?
Please choose the correct answer.
a) Single Results, Characteristics and Operations, Samples, Inspection Lots
b) Inspection Lots, Characteristics and Operations, Samples, Single Results
c) Samples, Single Results, Characteristics and Operations, Inspection Lots
d) Single Results, Samples, Characteristics and Operations, Inspection Lots
04. What is the maximum number of function modules you can assign to a single follow-up action for the usage decision in the Implementation Guide (IMG)?
Please choose the correct answer.
a) One
b) Zero
c) Ninety-nine
d) Unlimited
05. What do you set up when implementing a DP scenario?
Please choose the correct answer.
a) Cost center
b) Control key
c) General ledger
d) Hourly wages
06. You want to collect costs for repair work. What must you define in the work center?
Please choose the correct answer.
a) Activity types
b) Formulas
c) Set-up time
d) Cost center
07. What Quality Management master data does an inspection with defect recording require?
Please choose the correct answer.
a) Task list
b) Catalogs
c) Inspection methods
d) Master inspection characteristics
08. On which structure level can you control Sales and Distribution processes within QM for material and customer data?
Please choose the correct answer.
a) Company code
b) Sales organization
c) Distribution channel
d) Customer sales area
09. Which type of task list defines process steps independently of the inspection lot?
Please choose the correct answer.
a) Routing
b) Inspection plan
c) Reference object set
d) Master recipe
10. When you create a task list for an inspection lot, which objects are available for inspection?
There are 2 correct answers to this question.
a) Equipment
b) Batch
c) Handling unit
d) Material
If you have any feedback, pl send us on [email protected]