SAP Activate Project Manager Sample Questions:

QUESTIONS

01. How are the planned costs for the refurbished part or parts displayed in the planned/actual order report?
Please choose the correct answer.
a) As costs with a negative value
b) As costs with a positive value
c) As revenue with a negative value
d) As revenue with a positive value

02. In order type Customizing, you can set the default for when the purchase requisition is created to immediately, from release, or never. For which combination must you set the default?
Please choose the correct answer.
a) Order type and planner group
b) Order type and plant
c) Order type and responsible work center
d) Order type and material type

03. All maintenance plans in your systems are scheduled automatically via deadline monitoring. What happens when you set a manual call?
Please choose the correct answer.
a) The original scheduled dates of the maintenance plan remain.
b) All scheduled calls on hold are skipped.
c) All scheduled calls on hold are deleted.
d) The waiting call dates are re-scheduled on the basis of the manual call.

04. What does the serial number profile control?
Please choose the correct answer.
a) Whether a master batch is used for a serial number
b) Whether split valuation is used to describe the value of an individual part
c) Whether serial numbers must be assigned for a business transaction
d) Whether an individual part is assigned to a special stock

05. You want to set up an external refurbishment process through subcontracting, using material requirements planning (MRP). Which of the following must you set in the system?
Please choose the correct answer.
a) The Special Procurement indicator in the material master record
b) The Subcontracting flag for the refurbishment order type
c) The Material Provision indicator for special stock in the refurbishment order header
d) The Subcontracting flag in the refurbishment order header

06. Which of the following item categories can you use in a Plant Maintenance bill of material (BOM)?
There are 2 correct answers to this question.
a) Equipment
b) Stock material
c) Non-stock material
d) Assembly
e) Functional location

07. How is a new functional location initially assigned to its place in the hierarchy?
Please choose the correct answer.
a) Automatically based on the structure indicator
b) Manually using the List Editing transaction
c) Automatically based on the Bill of Material (BOM)
d) Manually using the Install transaction

08. You are using a maintenance plan for test equipment calibrations. When is an inspection lot created?
Please choose the correct answer.
a) After entering measuring point data that is out of tolerance
b) When a follow-up action is triggered from a malfunction report
c) Before the calibration order is created
d) When the calibration order is created

09. Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform?
There are 2 correct answers to this question.
a) Set the define Transfer of Project or Invest Program indicator.
b) Assign maintenance orders manually to a revision with revision type WPS-controlled.
c) Assign a network to a revision with revision type WPS-controlled.
d) Assign a hierarchical task list to a notification.
e) Assign the Reference PM/PS element to task list headers and network activities.

10. What do maintenance planner groups represent?
Please choose the correct answer.
a) A group of persons who plan maintenance capacities
b) A group of persons responsible for maintenance plans
c) A group of persons who plan maintenance task lists
d) A group of persons who plan maintenance activities for technical assets